Volunteers are shown assembling a DaLite 10'6" x 14' Rear Projection
Fast-Fold Deluxe Screen System. This screen was used during the entire week to display
PowerPoint shows and videos.
|
|
|
Brent Kucharo is installing amber gels in the PAR 64 fixtures. We used a total of
8 PAR 64’s on T truss to illuminate the stage platform.
|
|
|
Ryan Kucharo is shown doing the final hookups for our 100 Amp power distribution
box. This was required to provide the correct amount of power, on individual circuits,
to all equipment.
|
|
|
Ryan, Loretta and Nathan Kucharo are shown sitting in FOH after setup and preparing
for the evening devotional.
|
|
|
Loretta Kucharo is shown here operating the PowerPoint slideshow during a devotional.
We use a Dell Latitude laptop with Microsoft Office 2007.
|
|
|
Nathan Kucharo is shown at FOH operating the PowerPoint slideshow during the devotional.
|
|
|
For the week we designed a Microsoft PowerPoint template incorporating the designs,
colors and fonts used in the logo. Each day we were given slides from the song leader
and presenters and compiled them into a master slideshow. Members of our team cleaned
up and operated the shows. This provided a clean, flowing and professional look
for the whole evening.
|
|
|
Toby Levering, camp director, is standing in front of the screen displaying the
Wichita Workcamp logo while giving instructions to campers.
|
|
|
Mitch Wilburn, the week’s speaker, is shown speaking to the volunteers during the
evening devotional.
|
|
|
This image shows the complete setup from the week.
|